Skip to content

Your factory AI. In a box.

Local AI models, factory context and tools at your site: you choose what it reads, your team decides what to try.

Your plant, as one model.

Orders, parts, machines and documents, connected to the box. Turn the model, select a station or a part, or ask a question. The plant, orders and answers here are an example.

Example plantDrag to turn, Ctrl + scroll to zoom. Select a station or a part.
Loading the model
01 / 08

Stations and their factorIQ modules

  1. Order intakeThe model reads PDF purchase orders from the mailbox; deterministic checks validate the result, and a person approves. The approved result enters the ERP in structured form.
  2. PlanningStock, bills of materials, and capacity over six months. Changes remain a preview until the planner confirms them. Shows affected production and customer orders.
  3. Bought-in partsTracks the bought-in parts from the bill of materials: promised dates, delays, stock. Reports bottlenecks before they show up in manufacturing. Shows affected production and customer orders.
  4. ProductionUnstructured instructions from PDF and DOC are extracted and entered into the MES, with a confidence rating per field and a check by the operator.
  5. Shop floorKPIs from ERP and MES where the work happens: one screen per department, orders, due dates, and deviations as soon as they occur.
  6. InspectionExplains deviations from measurements, machine data, and tool changes. A person chooses the action.
  7. ShippingQueries after delivery: order, drawing, and inspection report pulled together, with a draft reply ready for approval.
  8. factorIQ BoxLocal AI models, factory context and tools, next to your ERP and MES. You choose what it can read.

Ask the example plant

  1. YouWhich purchase orders came in this morning?

    Your factoryThree from the mailbox. Two are checked and waiting for your approval. One has no delivery date; that field is marked.

    From: order intake
  2. YouWhere is order A-2417 right now?

    Your factoryIn production, on machine 2. Next come machine 3 and then inspection.

    From: ERP and MES
  3. YouWhich bought-in parts are running late?

    Your factoryTwo items for next week's orders. One of them moves order A-2431 back by two days.

    From: bought-in parts and the bill of materials
  4. YouHow is the fixture for part 220-14 set up?

    Your factoryStep 4 of the work instruction: clamp on the two reference faces, then check the zero point with the probe.

    From: work instruction 220-14
  5. YouWhy did yesterday's batch fail inspection?

    Your factoryI cannot answer that yet. Measurement data is not connected, and root-cause analysis is planned.

    Gap in the data

Example: answers come from the connected records and name their source. Where data is missing, the answer says so.

Questions that still need a phone call.

  1. Did this morning's purchase order reach the ERP?
  2. Which bought-in part is holding up next week?
  3. Which instruction applies at this machine today?
  4. Why did this batch fail inspection?

The answers exist: in the mailbox, in the ERP and MES, and in documents. The box brings them together in one place that you choose.

Inside the box

01

Selected documents and approved read-⁠only views

02

Private factorIQ stack

Models · factory context · tools

03

Your team reviews and decides

Selected documents, factory AI tools and team review

You choose what the box can access.

Same isolated network
Selected documentsApproved ERP views
Private factorIQ stack
Access chosen by your team
Network boundaryConnection beyond this boundary

No longer fully air-gapped

Your team chooses which documents and read-only system views are in scope. An ERP on the same isolated network can be connected without breaking an air gap. A connection across that boundary means the environment is no longer fully air-gapped. Local operation: in development.

Agree who runs the environment.

Managed with iosys

Discuss responsibilities for operating, maintaining and updating a managed setup.

Customer-owned environment

A customer environment may fit selected existing modules. Deployment, support and updates depend on the agreed scope.

Find the work before choosing the tool.

In a collaborative discovery, your team explains the process and its exceptions. Together, we review selected context and identify a candidate to validate.